Tuesday 1.07 Nick and Edgar



Manager Communication: Pretty quiet day all around until Trivia. Every table was filled by 7pm and even had some guests standing in to join us. I don't think i've seen it quite this packed, but it was manageable. 

Ran low on beer gas today, but NuCO came in and dropped off two back up tanks in case the machine doesn't get looked at tomorrow. I will call them first thing when i'm in to see if they will be stopping by. EA 

Customer Comments: Had a few guests that were not here for trivia unable to find seating since all the tables were brought down (and the rest were stuffed in the back of bar storage). Should we cycle those tables towards the front of the room and take from there for trivia going forward? That way we can keep seating upstairs for overflow and to maximize the room we have now that the pool table is up and running. EA

BAR Staff Observations: Miguel and Darius opened us up today and helped prep for Trivia. Gabrielle and Eliel were in to close with Maya as well for training. Maya stuck it out with Eliel downstairs and went through lobby close. Miguel swung upstairs and served the trivia floor while Darius and Gabrielle ran the bar. EA

Hiring/Training: Maya trained for lobby close today with Eliel and went over batching with them as well as ticketing policy. She's a great observer and picks up on protocol fairly quickly. I had Eliel fill out the binder. EA

Prep List: As far as I can tell, only a keg of old fashioned. I'll reassess tomorrow at open. EA

Maintenance: The LCD screen on the lobby coffee machine was cracked today when Eliel accidentally hit something against it. You can still technically brew coffee, but you have to go off muscle memory and if there's an error code, we won't be able to see it. 

I believe I found the replacement part. EA

https://www.kaldi.com/lcd-display-and-connector-assembly-hwd-2100 

Comments

Popular posts from this blog

Sunday 07.06.2025 Ian/Lauren

Sunday 03.09.2025 - Ian/Lauren

Nick Friday 2/11