Jesse Saturday 7.13



Manager Communication: A slow start to the day but rapid pick up as the afternoon went on. We built nicely on the sales for the 4s, sold out nearly all the 7s and the late round as well. We were very busy from 6:00 pm onwards, getting crushed on both service and maintaining a steadily busy bar. Lobby was more well spaced and manageable and in between pushes William or Susan would hold down the bar while the other batched and stocked. Kept 3 bartenders behind HiRes throughout with the other bartenders batching and they held it down. Cut to 1 down at 10:00 and 2 up at 11:00 pm.

Customer Comments: Spoke to three guests in Theatre 3 after Ellie told them twice to turn their phone off. They were then talking in the theatre and I told them to please keep their voices down and phones away or they would be kicked out. They were very short with both Ellie and myself, but followed rules for the remainder of the night so we let them say.

BAR Staff Observations: Ian is a really great addition to the team; good teamwork and great instincts, he was a huge asset upstairs. William and Susan rocked out balancing batching with working the bar and never left each other without support when they needed it AND got a massive amount of work done.

Prep List: We are batched strong and in very good shape.

Over/Short on Banks: HiRes-A was $20 short, going through their cash checks it was unclear the source of the issue.

Pay Outs: $146 to kitchen.

Maintenance: Leak in theatre 7 is dripping down through the exit sign by the door. Seems to be from condensation or a slow leak from a pipe as above that area there is no area of pooling water.

Comments

Popular posts from this blog

Sunday 12.08 Jenn/Ian

Sunday 01.07 Ashley/Ariel

Sunday 03.09.2025 - Ian/Lauren