Wednesday 09.18 Jenn/Ian



Manager Communication: 
Jenn batched a bunch of syrups for the upcoming menu and a whole load of Strawberry Mint syrup. Matthew crushed a small batch list - 1 Fleur keg, a Grapes of Wrath batch, and a half batch of Nightmare Material (we only had half a bottle of Banane du Bresil in house). -IP

I cut Matthew at 8p after a small rush for the 7:30 Blink Twice in Th. 5. 
I cut Kelsey at 9:30p after the mini-rush for the special screening of Nowhere in Th. 2. -IP

I put the bag of enamel MubiGo pins for THE SUBSTANCE in front of the Filmbot computer in Lobby bar for tomorrow's service. - IP

Customer Comments:

BAR Staff Observations: 
Patrick did a great job of customer facing. Didn't need to nudge him away from the pass, and he was excellent with the guests. Jeshua was a rockstar in the lobby.  Insisted on cleaning the bubblers himself, because he likes to be extra thorough. Self-sufficient service all around. This team is great. - IP

FOH Staff Observations: 
Isobel was awesome supporting the upstairs theaters. Ryan is fitting in great and was a constant presence at the pass when his drinks needed to be run. Great job! -IP

Hiring/Training:
Rebecca and Jovani were excellent (as usual) with their trainees. Siena and Max were in very good hands and seem to be picking it up quickly. -IP

Sick Leave/ Call outs:

Special Events?

Staff Meeting Agenda notes:

86ed / counts on items:

Prep List:
Will probably need to batch some Firewalk tomorrow, and definitely Nightmare Material when we get some more Banane du Bresil. -IP

R&D comp checks:

Over/Short on Banks:

Pay Outs:
Red Jacket Apple Cider - $6.99 from Trees Lounge drawer. -IP   

Lost & Found?:

Ordering/Receiving/Shipping:
Jeshua noted that we are almost out of food safe lubricant for the frozen machines. I was unable to find more in bar prep or kitchen. Was not needed tonight, but wanted to get ahead of it before Frozen cleaning day. -IP

Maintenance: 
The ice machine went on the fritz for a bit. Jenn and I reset it, and it worked for a little while before halting during the "harvesting process". I pulled off the cover and checked the guts - nothing visibly wrong, and after resetting it again, it began to make ice consistently. Was making ice through the end of service tonight. Definitely give it a check tomorrow. -IP 

The floor drain in the lobby bar underneath the triple sink and beer tower was clogged when Jeshua was closing, resulting in a minor flood of water behind the bar. After Vlad took care of the excess water, Jeshua went full Tim the Toolman Taylor and removed the drain filter which was caked with gunk, cleaned it and put it back - hopefully resolving the issue going forward. Dude is a champ. - IP

Mobilebytes Issues:

Filmbot Issues:

Comments

Popular posts from this blog

Sunday 12.08 Jenn/Ian

Sunday 01.07 Ashley/Ariel

Sunday 03.09.2025 - Ian/Lauren